Four of the ten structures AJ Services where contracted to Design, Fabricate and some of which to install in a seven week period.

Logistics was a major factor with the tight lead times and quick turnarounds, which in turn meant delivery dates could be met and our client could commission as planned.

One of the structures during installation, from starting fabrication to installation the structure was complete in seven days.