Birmingham Cantilever Project
Four of the ten structures AJ Services where contracted to Design, Fabricate and some of which to install in a seven week period. Logistics was a major factor with the tight leadRead More…
Four of the ten structures AJ Services where contracted to Design, Fabricate and some of which to install in a seven week period. Logistics was a major factor with the tight leadRead More…
3 more LOC platforms installed on the Birmingham project, one in close proximity to the overheads.
AJ Services completed the full fabrication and installation of an REB platform in Oxford from manufacture of the concrete pads which the platform was mounted on to the fittingRead More…
Triple LOC platform that we fabricated and installed for a Birmingham client. Custom access area was need for entry from the platform.Raised route support also being installed to the LOC platform.
Flue mast fabricated and installed in Birmingham for our client
LOC platforms currently being installed at Corby
AJ services working with Roadrail cranes helping to safely deliver the largest single signalling commissioning ever undertaken.
This job required a quick turnaround to meet the clients tight deadlines
12.5M flue mast going in at Oxford. EN1090 CE marked to Execution class 2.