Birmingham Cantilever Project
Four of the ten structures AJ Services where contracted to Design, Fabricate and some of which to install in a seven week period. Logistics was a major factor with the tight leadRead More…
Four of the ten structures AJ Services where contracted to Design, Fabricate and some of which to install in a seven week period. Logistics was a major factor with the tight leadRead More…
AJ Services installing a four track gantry at Kettering
AJ Services complete another installation of a two track cantilever in Bristol.
LOC platforms currently being installed at Corby
A blast from the past, AJ’s were tasked to team up with Roadrail Cranes & Siemens for the erection of 11 signal gantries 3 of which are featured on this post were erectedRead More…